A major concrete slab installation prepared for a waterfront sports bar.
Installation of an 8,790-square-foot, 12-inch concrete slab with heavy-gauge rebar reinforcement for a sports bar on the Intracoastal Waterway.
The work began with the structural foundation required for a high-use hospitality destination on the water.


